Frame Inspection
Pre-plaster (lock up)
Frame Inspection
The frame inspection is carried out at the same time as the post pour slab inspection. The inspection is a comprehensive and detailed assessment of all structural framing components and workmanship. During this inspection, we thoroughly examine the framing to confirm it is structurally sound and built to the required standards.
This stage is critically important. Together with the slab, the frame forms the structural “skeleton” of your home. Any flaws in either component can lead to significant defects throughout the rest of the building duration.
From a former supervisor’s perspective. If we get the frame right from the start, we set the job up for success.
Utilising the NCC, Building legislation, Australian Standards- AS 2870, AS 1684, AS 4440,AS 3660 and more; we check items such as-
- Bracing components
- Structural engineering components
- Wall plumb (straight)
- Brackets and other connection fastenings
- Frame overhang
- Junctions
- Load paths
- Noggins
- Bulkheads
- Flooring laid correctly
- Nails and other connections
- Correct materials used and signs of damage etc
- Roof truss layout and connections
- Termite system Part B
A quick note:
It’s best for this inspection to happen before any roofing materials are installed, so any issues can be fixed early, before extra weight is added to the structure.
If roofers are on site when we arrive, we won’t be able to enter the area due to safety requirements.
We carry out the frame inspection once the frame is fully built, including the installation of the roof trusses and all bracing. To help us see everything clearly, please ensure no pliable membrane (sisalation/wall wrap) has been wrapped around the home before we arrive. This material can block our view of the external bracing and make it difficult or even impossible for us to check everything properly.
Following this process helps us identify any defective and non-compliant work early, ensuring your home is built safely and to standard.
Utilising the NCC AS1684, AS3999, AS4200, AS1562 and more.
all outstanding frame inspection defects are completed
Walls straight and plumb
plumbing rough ins done
electrical rough ins done
ducted heating rough-ins done
Insulation installed correctly.
Wall wrap installed correctly.
Roof installation complete and house is water tight.
Plumbing and electrical works to be installed and compliant.
Bulkheads, Windows, cornice lines.
Doors installed plumb and level.
The roofline and tile/metal roofing installation.
All shower bases are checked for correct installation in accordance with their manufacture’s guidelines.
All baths are checked for proper support.
Ducting for WC and rangehood exhaust fans having been properly installed.
Timber door sills are properly flashed.